Date / Time / (DoY) Input date Log Entry Num Version Msg User Details Log Book Name Entry Text 2012-12-03 00:00:00 (338) 2012-12-03 00:04 (338) 149779 0 Warning MZ INT_LOG_01 TM: PD3508D 'SAS Unbalance' S/L-OOL (value= -1.059 A) - toggles in 'n' out 2012-12-02 23:21:00 (337) 2012-12-02 23:22 (337) 149773 0 Warning MZ INT_LOG_01 CCCF enabled in AS on sun120 as per INT_OPS_763 2012-12-02 22:50:00 (337) 2012-12-02 22:54 (337) 149769 0 Info MZ INT_LOG_01 Test Command sent OK 2012-12-02 22:47:00 (337) 2012-12-02 22:48 (337) 149768 0 Info MZ INT_LOG_01 Groundstation handover VIL2 --> Redu 2012-12-02 21:34:00 (337) 2012-12-02 21:35 (337) 149765 0 Info MZ INT_LOG_01 FCP_DHS_1235/1220 - Report & Reset OBM 2012-12-02 20:05:00 (337) 2012-12-02 20:07 (337) 149762 0 Warning MZ INT_LOG_01 CCCF enabled in AS on sun120 as per INT_OPS_763 2012-12-02 19:49:00 (337) 2012-12-02 20:00 (337) 149760 0 Info MZ INT_LOG_01 TC: D3301 'OR TT SUM' sent to update OBQD 2012-12-02 19:46:00 (337) 2012-12-02 20:00 (337) 149759 0 Warning MZ INT_LOG_01 CCCF enabled in AS on sun120 as per INT_OPS_763 2012-12-02 19:45:00 (337) 2012-12-02 19:59 (337) 149758 0 Info MZ INT_LOG_01 SPACON shift handover from IB to MZ 2012-12-02 19:22:00 (337) 2012-12-02 19:23 (337) 149755 0 Info IB INT_LOG_01 FCP_AOC_0540 - AOCS Daily Maintenance 2012-12-02 17:16:00 (337) 2012-12-02 17:18 (337) 149753 0 Info IB INT_LOG_01 FCP_EPS_1260 step 7 2012-12-02 17:14:00 (337) 2012-12-02 17:16 (337) 149752 0 Info IB INT_LOG_01 FCP_AOC_1905 - RMU Calibration (Roll = -87.12 / Pitch = 48.24 / Yaw = -120.24) 2012-12-02 16:28:00 (337) 2012-12-02 16:32 (337) 149747 0 Warning IB INT_LOG_01 OOL, toggling of para PD3508D sas unbalance, no action needed. 2012-12-02 16:05:00 (337) 2012-12-02 16:06 (337) 149746 0 Info IB INT_LOG_01 FCP_EPS_1260 Value in TC = 32 ( Hex 8927 ) upto and including step 6.1 2012-12-02 13:33:00 (337) 2012-12-02 13:33 (337) 149740 0 Warning IB INT_LOG_01 Bad frames from vil2 2012-12-02 12:31:00 (337) 2012-12-02 11:51 (337) 149736 0 Info IB INT_LOG_01 CRIT_INST_ALT_ASC - Radbelt exit 2012-12-02 11:43:00 (337) 2012-12-02 11:51 (337) 149735 0 Info IB INT_LOG_01 SPACON shift handover from me to ib 2012-12-02 11:19:00 (337) 2012-12-02 11:27 (337) 149731 0 Info ME INT_LOG_01 INT_OPS_566 - Antenna Swap TT commands uplinked 2012-12-02 11:04:00 (337) 2012-12-02 11:05 (337) 149728 0 Info ME INT_LOG_01 FCP_IBIS1_0401 - ISGRI CTX Tables uplinked 2012-12-02 10:28:00 (337) 2012-12-02 10:39 (337) 149725 0 Warning ME INT_LOG_01 OCR_764 SCC Reset ... performed 2012-12-02 10:09:00 (337) 2012-12-02 11:18 (337) 149730 0 Error ME INT_LOG_01 OEM: "SPI1 LSL ERROR" - 4 occurrences (within 8 seconds) None afterwards. No action required 2012-12-02 09:47:00 (337) 2012-12-02 11:14 (337) 149729 0 Error ME INT_LOG_01 OEM: "SPI1 FIXED POINT OVERFLOW" Only once. No action requred 2012-12-02 09:25:00 (337) 2012-12-02 09:28 (337) 149713 0 Info ME INT_LOG_01 Test Command sent OK 2012-12-02 09:24:00 (337) 2012-12-02 09:27 (337) 149712 0 Info ME INT_LOG_01 AOS TC VIL2 2012-12-02 09:20:27 (337) 2012-12-02 10:18 (337) 149719 0 Info ME INT_LOG_01 OEM: MS EVE ECD REACHED (BAT 1) 2012-12-02 09:18:51 (337) 2012-12-02 10:21 (337) 149720 0 Info ME INT_LOG_01 OEM: MS EVE ECD REACHED (BAT 2) 2012-12-02 09:06:00 (337) 2012-12-02 09:18 (337) 149711 0 Info ME INT_LOG_01 AOS TM VIL2 2012-12-02 07:12:46 (337) 2012-12-02 10:21 (337) 149721 0 Info ME INT_LOG_01 OEM: "ACC ECLIPSE END" (Stored) 2012-12-02 07:12:46 (337) 2012-12-02 10:22 (337) 149722 0 Error ME INT_LOG_01 OEM: "ACC AIMU OFF" (Stored) 2012-12-02 07:02:59 (337) 2012-12-02 10:23 (337) 149723 0 Info ME INT_LOG_01 ECLIPSE END 2012-12-02 06:37:00 (337) 2012-12-02 07:50 (337) 149703 0 Info ME INT_LOG_01 Timeline: TL__1238_04_20121126124217.INT loaded 2012-12-02 06:30:00 (337) 2012-12-02 07:53 (337) 149704 0 Info ME INT_LOG_01 --------------- Rev. 1238 --------------------- 2012-12-02 06:24:00 (337) 2012-12-02 07:56 (337) 149705 0 Info ME INT_LOG_01 Early LOS TC & TM Redu due to a ANT swap from T/L 2012-12-02 06:17:20 (337) 2012-12-02 07:59 (337) 149707 0 Info ME INT_LOG_01 ECLIPSE START 2012-12-02 06:07:00 (337) 2012-12-02 06:12 (337) 149697 0 Info ME INT_LOG_01 FCP_SYS_1110 - LOS check operations 2012-12-02 06:02:45 (337) 2012-12-02 07:57 (337) 149706 0 Info ME INT_LOG_01 OEM: "ACC ECLIPSE START" 2012-12-02 05:55:00 (337) 2012-12-02 08:02 (337) 149709 0 Info ME INT_LOG_01 OEM:"ACC AUTOCAL ENDED" 2012-12-02 05:45:00 (337) 2012-12-02 06:12 (337) 149696 0 Info ME INT_LOG_01 SPACON shift handover from AL to ME 2012-12-02 05:35:00 (337) 2012-12-02 08:01 (337) 149708 0 Info ME INT_LOG_01 OEM:"ACC AUTO CAL START" 2012-12-02 05:20:49 (337) 2012-12-02 05:22 (337) 149691 0 Error AF INT_LOG_01 OEM: "ACC AIMU ON" 2012-12-02 05:03:00 (337) 2012-12-02 04:49 (337) 149689 0 Info AF INT_LOG_01 CRIT_INST_ALT_DESC - Radbelt entry 2012-12-01 23:20:00 (336) 2012-12-01 23:41 (336) 149682 0 Info AF INT_LOG_01 FCP_AOC_1905 - RMU Calibration (Roll = -101.52 / Pitch = 46.08 / Yaw = -126.72) 2012-12-01 22:24:00 (336) 2012-12-01 22:25 (336) 149681 0 Info AF INT_LOG_01 FCP_DHS_1235/1220 - Report & Reset OBM 2012-12-01 20:14:00 (336) 2012-12-01 20:14 (336) 149671 0 Info AF INT_LOG_01 FCP_AOC_0540 - AOCS Daily Maintenance 2012-12-01 19:40:00 (336) 2012-12-01 20:05 (336) 149667 0 Info AF INT_LOG_01 SPACON shift handover from MZ to AF 2012-12-01 16:31:00 (336) 2012-12-01 16:32 (336) 149647 0 Info MZ INT_LOG_01 Test Command sent OK 2012-12-01 16:27:00 (336) 2012-12-01 16:29 (336) 149646 0 Info MZ INT_LOG_01 Groundstation handover MSP --> Redu 2012-12-01 16:21:00 (336) 2012-12-01 16:22 (336) 149645 0 Info MZ INT_LOG_01 OMC stop FF-CAL 2012-12-01 13:26:00 (336) 2012-12-01 13:33 (336) 149644 0 Info MZ INT_LOG_01 OMC start FF-CAL 2012-12-01 12:44:00 (336) 2012-12-01 12:55 (336) 149643 0 Warning MZ INT_LOG_01 OEM: "ACC ROLL ERROR OOL" 2012-12-01 12:32:00 (336) 2012-12-01 12:32 (336) 149642 0 Info MZ INT_LOG_01 FCP_AOC_0615 - ACC OEM Buffer dump 2012-12-01 11:59:00 (336) 2012-12-01 12:09 (336) 149641 0 Error MZ INT_LOG_01 TM: A5702 'MOD 4096 COUNTER' H/H-OOL 2012-12-01 11:51:00 (336) 2012-12-01 12:06 (336) 149640 0 Warning MZ INT_LOG_01 CCCF enabled in AS on sun120 as per INT_OPS_763 2012-12-01 11:45:00 (336) 2012-12-01 12:05 (336) 149639 0 Info MZ INT_LOG_01 SPACON shift handover from IB to MZ 2012-12-01 11:03:00 (336) 2012-12-01 11:06 (336) 149634 0 Info IB INT_LOG_01 Test Command sent OK. 2012-12-01 11:02:00 (336) 2012-12-01 11:06 (336) 149633 0 Info IB INT_LOG_01 Station handover from VIL2 to MASPAL 2012-12-01 10:58:00 (336) 2012-12-01 11:08 (336) 149632 1 Error IB R INT_LOG_01 It seems that Redu has been taken by Galieo and we will instead have a pass on MS until about 16:30z. There was no OR to inform the spacon about this change! 2012-12-01 10:57:00 (336) 2012-12-01 10:47 (336) 149631 0 Info IB INT_LOG_01 Groundstation handover VIL2 --> Redu 2012-12-01 09:29:00 (336) 2012-12-01 09:31 (336) 149623 0 Info IB INT_LOG_01 FCP_DHS_1235/1220 - Report & Reset OBM 2012-12-01 08:04:00 (336) 2012-12-01 08:05 (336) 149618 0 Info IB INT_LOG_01 FCP_AOC_1905 - RMU Calibration (Roll = -89.28 / Pitch = 54 / Yaw = -151.2) 2012-12-01 07:26:00 (336) 2012-12-01 07:28 (336) 149617 0 Info IB INT_LOG_01 Test Command sent OK 2012-12-01 07:22:00 (336) 2012-12-01 07:07 (336) 149614 0 Info IB INT_LOG_01 Groundstation handover Redu --> VIL2 2012-12-01 07:22:00 (336) 2012-12-01 07:24 (336) 149616 0 Error IB INT_LOG_01 Links to VIL2 established ok 2012-12-01 07:15:00 (336) 2012-12-01 07:23 (336) 149615 0 Error IB INT_LOG_01 Unable to connect TLM links to VIL2, estrack to investigate. 2012-12-01 05:30:00 (336) 2012-12-01 05:51 (336) 149611 0 Info IB INT_LOG_01 SPACON shift handover from af to ib 2012-11-30 22:00:00 (335) 2012-11-30 22:02 (335) 149583 0 Info AF INT_LOG_01 FCP_DHS_1235/1220 - Report & Reset OBM 2012-11-30 19:51:00 (335) 2012-11-30 19:51 (335) 149580 0 Info AF INT_LOG_01 FCP_AOC_0540 - AOCS Daily Maintenance 2012-11-30 19:50:00 (335) 2012-11-30 19:51 (335) 149579 0 Info AF INT_LOG_01 SPACON shift handover from MZ to AF 2012-11-30 19:27:00 (335) 2012-11-30 19:27 (335) 149576 0 Warning MZ INT_LOG_01 CCCF enabled in AS on sun120 as per INT_OPS_763 2012-11-30 16:48:00 (335) 2012-11-30 16:49 (335) 149573 0 Warning MZ INT_LOG_01 CCCF enabled in AS on sun120 as per INT_OPS_763 2012-11-30 14:17:00 (335) 2012-11-30 14:48 (335) 149565 0 Warning MZ INT_LOG_01 CCCF enabled in AS on sun120 as per INT_OPS_763 2012-11-30 11:37:00 (335) 2012-11-30 11:56 (335) 149556 0 Info MZ INT_LOG_01 FCP_AOC_1905 - RMU Calibration (Roll = -100.08 / Pitch = 47.52 / Yaw = -117.36) 2012-11-30 11:35:00 (335) 2012-11-30 11:55 (335) 149555 0 Info MZ INT_LOG_01 SPACON shift handover from IB to MZ 2012-11-30 10:55:00 (335) 2012-11-30 10:56 (335) 149552 0 Info IB INT_LOG_01 Test Command sent OK 2012-11-30 10:52:00 (335) 2012-11-30 10:18 (335) 149550 0 Info IB INT_LOG_01 Groundstation handover VIL2 --> Redu 2012-11-30 09:29:00 (335) 2012-11-30 09:30 (335) 149547 0 Info IB INT_LOG_01 FCP_DHS_1235/1220 - Report & Reset OBM 2012-11-30 08:53:00 (335) 2012-11-30 09:07 (335) 149546 0 Warning IB INT_LOG_01 Bad frames from VIL2 due to low signal strength 2012-11-30 06:49:00 (335) 2012-11-30 06:50 (335) 149539 0 Info IB INT_LOG_01 Test Command sent OK 2012-11-30 06:44:00 (335) 2012-11-30 06:41 (335) 149538 1 Info IB R INT_LOG_01 Groundstation handover Redu --> VIL2 2012-11-30 05:43:00 (335) 2012-11-30 06:15 (335) 149537 0 Info IB INT_LOG_01 SPACON shift handover from lt to ib 2012-11-30 04:11:00 (335) 2012-11-30 04:12 (335) 149528 0 Info LT INT_LOG_01 FCP_AOC_0615 - ACC OEM Buffer dump 2012-11-29 23:38:00 (334) 2012-11-29 23:28 (334) 149522 0 Info LT INT_LOG_01 FCP_DHS_1235/1220 - Report & Reset OBM 2012-11-29 23:19:22 (334) 2012-11-29 23:25 (334) 149520 1 Warning LT R INT_LOG_01 param PD3508D(SAS Unbalance) OOL LOW with value -1.059 for a few seconds (Toggles) according to the AOCS cross reference is NOT CRITICAL and there is nothing mentioned for the recovery actions. 2012-11-29 23:13:48 (334) 2012-11-29 23:18 (334) 149518 0 Info LT INT_LOG_01 S/S AOCS enabled on the A/S 2012-11-29 23:13:46 (334) 2012-11-29 23:17 (334) 149517 0 Error LT INT_LOG_01 FDS: TPF 1237_0501_A.OSL applied on A/S to update slew 12370017 2012-11-29 23:10:00 (334) 2012-11-29 23:18 (334) 149519 0 Error LT INT_LOG_01 SEQ: AESAM_00 uplinked & recovery tool started 2012-11-29 22:59:00 (334) 2012-11-29 23:06 (334) 149516 0 Error LT INT_LOG_01 Manual slew 1237_0500_M.CSL from PID #12370016 to #12370016 2012-11-29 22:57:00 (334) 2012-11-29 22:58 (334) 149514 0 Error LT INT_LOG_01 SEQ: AESAM_00 uplinked & recovery tool started 2012-11-29 22:55:00 (334) 2012-11-29 22:59 (334) 149515 0 Error LT INT_LOG_01 PID #12370016 lost due to OTF NOT REACHED 2012-11-29 22:53:23 (334) 2012-11-29 22:56 (334) 149513 0 Error LT INT_LOG_01 OEM: "ACC AIMU OFF" 2012-11-29 22:39:22 (334) 2012-11-29 22:55 (334) 149512 1 Error LT R INT_LOG_01 S/S AOCS disabled on the A/S Only the last 3 CMD's for the slew were missed : A3132(RC SLEW MAN) A3085(RC SUN STEER INI) A3089(START SUN STEER) The slew was executed because the AOCS was disabled just after the CMD to start the slew A3129(STERT SLEW MAN) at 22:39:11 2012-11-29 22:38:36 (334) 2012-11-29 22:47 (334) 149511 1 Error LT R INT_LOG_01 OEM: "ACC STR THR EX" OEM: "ACC AIMU ON" during sending the CMD's for OSL 2012-11-29 21:57:00 (334) 2012-11-29 22:02 (334) 149506 0 Error LT INT_LOG_01 SYS: Performed restart of ISDS + IFRD (isdsa) 2012-11-29 21:47:00 (334) 2012-11-29 22:02 (334) 149507 0 Error LT INT_LOG_01 SYS: Error sending data to isds on a-chain 2012-11-29 21:45:00 (334) 2012-11-29 21:54 (334) 149504 0 Info LT INT_LOG_01 SPACON shift handover from AF to LT 2012-11-29 21:27:00 (334) 2012-11-29 21:33 (334) 149503 0 Info AF INT_LOG_01 Test Command sent OK 2012-11-29 21:24:00 (334) 2012-11-29 21:32 (334) 149502 0 Warning AF INT_LOG_01 OCR # 761 G/S H/O VIL2 to REDU 2012-11-29 20:08:00 (334) 2012-11-29 20:09 (334) 149497 0 Info AF INT_LOG_01 FCP_AOC_0540 - AOCS Daily Maintenance 2012-11-29 17:20:00 (334) 2012-11-29 17:24 (334) 149491 0 Info AF INT_LOG_01 FCP_AOC_1905 - RMU Calibration (Roll = -97.92 / Pitch = 45.36 / Yaw = -146.16) 2012-11-29 16:26:00 (334) 2012-11-29 17:02 (334) 149490 0 Info AF INT_LOG_01 Test Command sent OK 2012-11-29 16:23:00 (334) 2012-11-29 17:01 (334) 149489 0 Warning AF INT_LOG_01 OCR # 761 G/S H/O REDU to VIL2 2012-11-29 15:39:00 (334) 2012-11-29 15:40 (334) 149486 0 Info AF INT_LOG_01 FCP_EPS_1260 step 7: P2431 uplinked 2012-11-29 14:32:00 (334) 2012-11-29 14:42 (334) 149484 0 Info AF INT_LOG_01 FCP_EPS_1260 MRU EOC Timer, value set to Hex C9C7 2012-11-29 13:13:00 (334) 2012-11-29 13:15 (334) 149481 0 Info AF INT_LOG_01 SCCT reset 2012-11-29 12:44:00 (334) 2012-11-29 12:31 (334) 149480 1 Info AF R INT_LOG_01 CRIT_INST_ALT_ASC - Radbelt exit 2012-11-29 11:45:00 (334) 2012-11-29 11:47 (334) 149477 0 Info AF INT_LOG_01 SPACON shift handover from MZ to AF 2012-11-29 11:20:00 (334) 2012-11-29 11:21 (334) 149474 0 Info MZ INT_LOG_01 INT_OPS_566 - Antenna Swap TT commands uplinked 2012-11-29 11:11:00 (334) 2012-11-29 11:11 (334) 149472 0 Info MZ INT_LOG_01 FCP_IBIS1_0401 - ISGRI CTX Tables uplinked 2012-11-29 10:23:00 (334) 2012-11-29 10:26 (334) 149468 0 Error MZ INT_LOG_01 OEM: "IBIS1 PICSIT NOISY SEMIMODULE ..." 2012-11-29 10:01:01 (334) 2012-11-29 10:51 (334) 149471 0 Info MZ INT_LOG_01 SYS: Link MADDS-ISDS --> TM FLOW(a) 2012-11-29 10:01:00 (334) 2012-11-29 10:51 (334) 149470 0 Error MZ INT_LOG_01 SYS: Error sending data to isds(a) 2012-11-29 10:00:00 (334) 2012-11-29 10:03 (334) 149467 0 Error MZ INT_LOG_01 CD: CD production failed! 2012-11-29 09:55:00 (334) 2012-11-29 10:03 (334) 149466 0 Info MZ INT_LOG_01 FCP_SYS_1100 - AOS check operations 2012-11-29 09:29:00 (334) 2012-11-29 09:33 (334) 149460 0 Info MZ INT_LOG_01 AOS TC Redu 2012-11-29 09:21:01 (334) 2012-11-29 09:33 (334) 149459 0 Error MZ INT_LOG_01 SYS: MS on sun121 + sun129 crashed --> restarted 2012-11-29 09:21:00 (334) 2012-11-29 09:31 (334) 149458 0 Info MZ INT_LOG_01 AOS TM Redu 2012-11-29 08:20:00 (334) 2012-11-29 10:02 (334) 149465 0 Info MZ INT_LOG_01 OEM: MS EVE ECD REACHED (BAT 1) - stored event 2012-11-29 08:19:00 (334) 2012-11-29 10:02 (334) 149464 0 Info MZ INT_LOG_01 OEM: MS EVE ECD REACHED (BAT 2) - stored event 2012-11-29 08:06:22 (334) 2012-11-29 08:35 (334) 149456 0 Warning MZ INT_LOG_01 ---------- REVOLUTION 1237 ---------- 2012-11-29 07:17:01 (334) 2012-11-29 10:01 (334) 149463 0 Warning MZ INT_LOG_01 OEM: "ACC AIMU OFF" - stored event 2012-11-29 07:17:00 (334) 2012-11-29 10:00 (334) 149462 0 Warning MZ INT_LOG_01 OEM: "ACC ECLIPSE END" - stored event 2012-11-29 07:10:00 (334) 2012-11-29 07:32 (334) 149454 0 Info MZ INT_LOG_01 Timeline: TL__1237_04_20121123154927.INT loaded 2012-11-29 06:37:00 (334) 2012-11-29 06:39 (334) 149450 0 Info MZ INT_LOG_01 LOS TM & TC due to onboard antenna swap 2012-11-29 06:24:00 (334) 2012-11-29 06:30 (334) 149449 0 Warning MZ INT_LOG_01 OEM: "ACC ECLIPSE START" 2012-11-29 06:20:00 (334) 2012-11-29 06:21 (334) 149448 0 Info MZ INT_LOG_01 FCP_SYS_1110 - LOS check operations 2012-11-29 06:16:00 (334) 2012-11-29 06:18 (334) 149447 0 Info MZ INT_LOG_01 SYS: S/S AOCS enabled in TL + Reset IL 2012-11-29 05:43:00 (334) 2012-11-29 05:59 (334) 149445 0 Warning MZ INT_LOG_01 TM: P1112 'LCL STA IMU1' status-OOL (value= CLOSE) + OEM: "ACC AIMU ON" 2012-11-29 05:40:00 (334) 2012-11-29 05:59 (334) 149444 0 Info MZ INT_LOG_01 SPACON shift handover from LT to MZ 2012-11-29 05:17:00 (334) 2012-11-29 05:14 (334) 149441 0 Info LT INT_LOG_01 CRIT_INST_ALT_DESC - Radbelt entry 2012-11-29 05:05:00 (334) 2012-11-29 05:11 (334) 149440 0 Error LT INT_LOG_01 S/S AOCS disabled on the A/S 2012-11-29 05:03:00 (334) 2012-11-29 05:10 (334) 149439 0 Error LT INT_LOG_01 FD Tool finished with message: The current guidestar is suitable for RWB. The next RWB ED can be safetly executed from Timeline. However the preceding CGS in the Timeline should NOT be executed 2012-11-29 04:57:00 (334) 2012-11-29 05:05 (334) 149438 0 Error LT INT_LOG_01 SEQ: AESAM_00 uplinked & recovery tool started using option 7 (CGS) 2012-11-29 04:50:00 (334) 2012-11-29 04:58 (334) 149437 0 Error LT INT_LOG_01 FDS: TPF update failed for CGS 2012-11-28 23:02:00 (333) 2012-11-28 23:03 (333) 149418 0 Info LT INT_LOG_01 FCP_AOC_1905 - RMU Calibration (Roll = -93.60 as/s Pitch = 43.20 as/s Yaw = -121.68 as/s) 2012-11-28 22:26:00 (333) 2012-11-28 22:26 (333) 149417 0 Info LT INT_LOG_01 FCP_DHS_1235/1220 - Report & Reset OBM 2012-11-28 20:31:00 (333) 2012-11-28 20:31 (333) 149413 0 Info LT INT_LOG_01 FCP_AOC_0615 - ACC OEM Buffer dump 2012-11-28 20:25:00 (333) 2012-11-28 20:26 (333) 149411 0 Info LT INT_LOG_01 FCP_AOC_0540 - AOCS Daily Maintenance 2012-11-28 19:45:00 (333) 2012-11-28 20:27 (333) 149412 0 Info LT INT_LOG_01 SPACON shift handover from AF to LT 2012-11-28 12:28:00 (333) 2012-11-28 12:40 (333) 149384 0 Info AF INT_LOG_01 Test Command sent OK 2012-11-28 12:25:00 (333) 2012-11-28 12:40 (333) 149383 0 Info AF INT_LOG_01 Groundstation handover VIL2 --> Redu OCR #761 2012-11-28 11:44:00 (333) 2012-11-28 12:38 (333) 149382 0 Info AF INT_LOG_01 SPACON shift handover from MZ to AF 2012-11-28 10:00:00 (333) 2012-11-28 10:08 (333) 149373 0 Error MZ INT_LOG_01 CD: CD production failed! 2012-11-28 09:55:00 (333) 2012-11-28 09:56 (333) 149372 0 Info MZ INT_LOG_01 FCP_DHS_1235/1220 - Report & Reset OBM 2012-11-28 08:55:00 (333) 2012-11-28 09:19 (333) 149367 0 Info MZ INT_LOG_01 SYS: Link MADDS-ISDS --> TM FLOW(a) 2012-11-28 08:54:00 (333) 2012-11-28 09:19 (333) 149366 0 Error MZ INT_LOG_01 SYS: Error sending data to isds(a) 2012-11-28 08:00:00 (333) 2012-11-28 08:09 (333) 149358 1 Error MZ R INT_LOG_01 AUX: No OLF files received for some hours - Analyst informed 2012-11-28 07:57:01 (333) 2012-11-28 08:32 (333) 149361 0 Info MZ INT_LOG_01 SYS: Link MADDS-ISDS --> TM FLOW(a) 2012-11-28 07:57:00 (333) 2012-11-28 08:32 (333) 149362 0 Error MZ INT_LOG_01 SYS: Error sending data to isds(a) 2012-11-28 07:52:00 (333) 2012-11-28 08:32 (333) 149360 0 Info MZ INT_LOG_01 SYS: Link MADDS-ISDS --> TM FLOW(a) 2012-11-28 07:51:00 (333) 2012-11-28 08:32 (333) 149359 0 Error MZ INT_LOG_01 SYS: Error sending data to isds(a) 2012-11-28 07:10:00 (333) 2012-11-28 07:13 (333) 149354 0 Info MZ INT_LOG_01 Test Command sent OK 2012-11-28 07:07:00 (333) 2012-11-28 07:08 (333) 149353 0 Warning MZ INT_LOG_01 Groundstation handover Redu --> VIL2 as per INT_OPS_761 2012-11-28 06:14:00 (333) 2012-11-28 06:15 (333) 149351 0 Info MZ INT_LOG_01 TC: D3301 'OR TT SUM' sent to update OBQD 2012-11-28 06:02:00 (333) 2012-11-28 06:07 (333) 149350 0 Error MZ INT_LOG_01 SYS: sun121 "RED" on MCCM due to high cpu usage --> TM-Desktop(SPI) reloaded 2012-11-28 05:45:00 (333) 2012-11-28 05:58 (333) 149348 0 Info MZ INT_LOG_01 SPACON shift handover from AL to MZ 2012-11-28 05:03:00 (333) 2012-11-28 05:04 (333) 149343 0 Info AL INT_LOG_01 FCP_AOC_1905 - RMU Calibration (Roll = -89.28 / Pitch = 58.32 / Yaw = -149.04) 2012-11-27 22:10:00 (332) 2012-11-27 23:00 (332) 149335 0 Info AL INT_LOG_01 FCP_DHS_1235/1220 - Report & Reset OBM 2012-11-27 20:20:00 (332) 2012-11-27 20:46 (332) 149328 0 Info AL INT_LOG_01 FCP_AOC_0540 - AOCS Daily Maintenance 2012-11-27 19:44:00 (332) 2012-11-27 19:45 (332) 149326 0 Info AL INT_LOG_01 SPACON shift handover from LT to AL 2012-11-27 14:36:00 (332) 2012-11-27 14:37 (332) 149310 0 Info LT INT_LOG_01 Test Command sent OK 2012-11-27 14:32:00 (332) 2012-11-27 14:37 (332) 149309 1 Info LT R INT_LOG_01 Groundstation handover VIL2 --> Redu ( OR #761) 2012-11-27 11:03:00 (332) 2012-11-27 11:06 (332) 149295 0 Info AF INT_LOG_01 FCP_AOC_1905 - RMU Calibration (Roll = -91.44 / Pitch = 56.16 / Yaw = -155.52) 2012-11-27 10:01:00 (332) 2012-11-27 12:28 (332) 149293 1 Info NPf R INT_LOG_01 FCP_EPS_1260 Battery EOC Timer, Change Time; Select Battery Full Charge Rate C/13 for both batteries; FCP_DHS_1232 Report & Load OBM entries for Eclipse season 2012-11-27 09:04:00 (332) 2012-11-27 09:14 (332) 149291 0 Error AF INT_LOG_01 G/S: Missing source packets from G/S: VIL2, reason: RFI 2012-11-27 07:15:00 (332) 2012-11-27 07:18 (332) 149285 0 Info AF INT_LOG_01 Test Command sent OK 2012-11-27 07:12:00 (332) 2012-11-27 07:17 (332) 149284 0 Info AF INT_LOG_01 Groundstation handover Redu --> VIL2 2012-11-27 05:44:00 (332) 2012-11-27 05:52 (332) 149280 0 Info AF INT_LOG_01 SPACON shift handover from AL to AF 2012-11-27 05:08:00 (332) 2012-11-27 05:09 (332) 149278 0 Info AL INT_LOG_01 FCP_AOC_0615 - ACC OEM Buffer dump 2012-11-27 04:40:00 (332) 2012-11-27 04:41 (332) 149276 0 Warning AL INT_LOG_01 TM: A5702 'MOD 4096 COUNTER' H/H-OOL 2012-11-27 01:10:00 (332) 2012-11-27 01:13 (332) 149270 0 Error AL INT_LOG_01 G/S: Bad Frames from: RED, duration: 20s, reason: RFI 2012-11-26 22:16:00 (331) 2012-11-26 22:17 (331) 149252 0 Info AL INT_LOG_01 FCP_DHS_1235/1220 - Report & Reset OBM 2012-11-26 20:20:00 (331) 2012-11-26 20:20 (331) 149238 0 Info AL INT_LOG_01 FCP_AOC_0540 - AOCS Daily Maintenance 2012-11-26 19:46:00 (331) 2012-11-26 19:48 (331) 149236 0 Info AL INT_LOG_01 SPACON shift handover from LT to AL 2012-11-26 17:03:00 (331) 2012-11-26 17:04 (331) 149223 0 Info LT INT_LOG_01 FCP_AOC_1905 - RMU Calibration (Roll = -93.60 as/s Pitch = 51.84 as/s Yaw = -149.04 as/s) 2012-11-26 13:36:38 (331) 2012-11-26 13:51 (331) 149212 0 Warning CL INT_LOG_01 Eclipse season preparation via FCP_AOC_0524. Set new subset 1 AMD thresholds 2012-11-26 13:28:00 (331) 2012-11-26 13:29 (331) 149210 0 Info LT INT_LOG_01 param G6107(V1E-H4-MOD28V) back within limits 2012-11-26 12:57:00 (331) 2012-11-26 13:05 (331) 149206 1 Info LT R INT_LOG_01 CRIT_INST_ALT_ASC - Radbelt exit 2012-11-26 11:51:00 (331) 2012-11-26 13:07 (331) 149208 0 Info LT INT_LOG_01 SPACON shift handover from AF to LT 2012-11-26 11:08:00 (331) 2012-11-26 11:18 (331) 149199 0 Info AF INT_LOG_01 INT_OPS_566 - Antenna Swap TT commands uplinked 2012-11-26 10:54:00 (331) 2012-11-26 10:55 (331) 149197 0 Info AF INT_LOG_01 FCP_IBIS1_0401 - ISGRI CTX Tables uplinked 2012-11-26 10:08:00 (331) 2012-11-26 10:16 (331) 149193 0 Info AF INT_LOG_01 FCP_SYS_1100 - AOS check operations 2012-11-26 09:45:00 (331) 2012-11-26 13:30 (331) 149211 0 Warning LT INT_LOG_01 param G6107(V1E-H4-MOD28V) OOL High with value 29.46 V 2012-11-26 09:44:00 (331) 2012-11-26 10:16 (331) 149192 0 Info AF INT_LOG_01 Test Command sent OK 2012-11-26 09:35:02 (331) 2012-11-26 10:15 (331) 149191 0 Error AF INT_LOG_01 OMCH task on imca and MSTACKs on SUN 122, 121 & 129 crashed @ AOS REDU 2012-11-26 09:35:00 (331) 2012-11-26 10:11 (331) 149190 0 Info AF INT_LOG_01 AOS TM Redu 2012-11-26 07:25:00 (331) 2012-11-26 07:35 (331) 149183 0 Info AF INT_LOG_01 Timeline: TL__1236_03 loaded 2012-11-26 06:43:00 (331) 2012-11-26 06:50 (331) 149182 0 Info AF INT_LOG_01 LOS TM & TC due to onboard antenna swap 2012-11-26 06:26:00 (331) 2012-11-26 06:29 (331) 149180 0 Info AF INT_LOG_01 FCP_SYS_1110 - LOS check operations 2012-11-26 05:43:00 (331) 2012-11-26 05:54 (331) 149175 0 Info AF INT_LOG_01 SPACON shift handover from ME to AF 2012-11-26 05:30:00 (331) 2012-11-26 05:31 (331) 149174 0 Info ME INT_LOG_01 CRIT_INST_ALT_DESC - Radbelt entry 2012-11-26 04:51:00 (331) 2012-11-26 04:55 (331) 149172 0 Info ME INT_LOG_01 K/LESAFE02 - JEM-X1/2 to safe from timeline