REVOLUTION 1176 - Report of June 2, 2012


 
 Perigee Passage at start : 2012-05-30T21:12:10
 Perigee Passage at end   : 2012-06-02T21:01:27
 Radiation Belt exit      : 46973 km (ijd 4534.0094)
 Radiation Belt entrance  : 25576 km (ijd 4536.8235)
 
 Operations Coordinator   : Enrico Bozzo
 Pipeline Operator        : Ph.M.
 Scientist on Duty        : Celine Tchernin

 1. Planning summary
 ===================

 1.1 General remarks
 
 a) Eclipse Season. JEM-X 1 and 2 on.
 
 b) 2012-05-30T22:34: JEM-X 2 DFEE anomaly occurred during the post-eclipse reconfiguration.
    MOC performed a DFEE power cycle. JEM-X2 was enabled at 22:55:30 (nominal).
             
 c) 2012-05-31T18:04: Pointings 18, 19 missed.

 d) 2012-06-02T09:05: PICsIT reset followed by a HEPI resync.
  
 1.2 Pointings summary
 
   Remarks: Only Science Windows (ScWs) of type 'pointing' are considered.
 - Exposures info from POD version 1. Pointings info from TSF version 3. 
 - Durations in exec/planned format; data gaps and bad time intervals not excluded from total time.
 - Deviations: only unexpected deviations >30 secs for pointings assigned to an exposure reported;
   expected deviations (first & last pointings of an exposure longer than planned) not reported.  
  • Exposure 11760001: 'LMC/SN 1987A', 5x5 (31x3530s) 31 pointings: 11760002 -> 11760032, 109576s/109430s (+2m26s) Deviations: 11760018 3472/3530s: see 1.1.c) 11760019 3603/3530s: see 1.1.c)
  • Exposure 11760002: 'LMC/SN 1987A', 5x5 (32x3530s) 32 pointings: 11760033 -> 11760064, 114216s/112960s (+20m56s)
  • Pointings with no assigned Exposure 2 pointings: 11760001, 0065, 14356s/1238s (+3h38m37s)
2. NRT Data processing ====================== 2.1 Telemetry * Start reception: 2012-05-30T22:22:11 End reception: 2012-06-02T19:33:13 * TM gaps of more than 30 seconds: 2012-06-01T12:27:15 - 2012-06-01T12:27:46 * Frames missed: 2012-05-31T17:47:29 242 frames missed (3613825995 to 3613826236) 2012-05-31T17:47:29 310 frames missed (3613826307 to 3613826616) 2012-06-01T12:27:15 176 frames missed (3614900952 to 3614901127) 2012-06-01T12:27:46 883 frames missed (3614901204 to 3614902086) * ERT not in sync with UTC: - * Statistics: Mean Rate: 15.99 frames/sec (mean) Frames: 3982182 total Packets: 5735601 total : 0 missed : 2733 missed : 2858857 TM : 5717714 TM : 1123325 idle : 0 tcmd : 0 invalid : 17887 time : 0 idle : 0 invalid * Errors: NCTRSFRAME: invalid quality = 256 (should be 0 or 1): 2.2 Auxiliary files summary POD OPP TSF PAF OLF ASF AHF THF ORB REVNO ------------------------------------------------------------- 1 1 1 1 71 68 1 72 1 1 2.3 Pre-processing * Frequent errors for days 2012-05-31, 2012-06-01, 2012-06-02, respectively: 21 25 17 "Histogram rejected" 0 0 0 "OBT found too much higher" 2 2 0 "packet(s) of the Histogram are discarded" 0 1 0 "Can not store the Histogram" 1 4 0 "SpiSpectrum, decompression failed" 1 4 0 "SpiSpectrumParser, Failure" 2.4 OPUS Pipelines processing * REV: completed | errors * INPUT/SCW: completed | errors ------------------------------- ---------------------------- IREM : 69 | 0 135 | 0 ISGRI_cal : 24 | 0 ISGRI_noise: 135 | 0 IBIS_veto : 22 | 0 * QLA completed | errors PICsIT_cal : 59 | 0 ----------------------------- JMX : 280 | 0 IBIS : 65 | 0 ilt : 1 | 0 JEMX-1 : " | 0 Archiving : 1 | 0 JEMX-2 : " | 0 2.5 ISGRI context table 2012-06-02T00:40: IIMG_SDCMOC_D20120531012629_00001.INT sent to MOC 3. Alerts ========= 3.1 All alerts except OOLs and missing scientific data * Level 2: 304 SPI Spectrum Decompression Failure Decompression failed in the usds routine! Inform SPI specialists 2012-06-01T14:56 603 The pointing hasn't increased by one. From 17 to 9500 From file: 1176_0020_ASF Convert attitude RRRR=1176 ROW=19. Missing pointing ? -> see 1.1.c) 3041 Check NEW context from orbit 1176 (on 2012-05-31T01:26:29) Program / version that has created this alert: ibis_isgr_low_thres 6.4 Directory of alert generation: /export/isdc/run/pipelines/nrt/nrtrev/scratch/1176_20120531012629_00_ilt Number of DEAD: 736 (limit is 730) Number NEW DEAD: 1 (limit is 9) -> e-mail to IRFU/SAp * Level 1: 604 Exposure time is 3473 sec. instead of 3530 sec. Pointing ID (BCPPID): 11760018 604 Exposure time is 3603 sec. instead of 3530 sec. Pointing ID (BCPPID): 11760019 -> see 1.1.c) 3.2 Parameter out of limits IBIS: ----- PICsIT reset in ScW: 117600550021,117600560010 P0S_MM[1-8]LTC1 P0S_MM[1-8]LTC2 P0S_MM[1-8]RTC1 P0S_MM[1-8]RTC2 P0E_MMMCRER from 2012-06-02T09:05:13 (UTC) to 2012-06-02T09:06:09 (UTC): OMC: ---- Due to eclipse, ScW 117500000012,117500000021: PCURR__1 SVOLT___M5 SVOLT___M12 SVOLT___P5 SVOLT___P12 SVOLT___P36 3.3 Missing scientific data Nothing special 4. Instruments checks ===================== 4.1. IOSM daily check (standard long term displays) JEM-X2 post-eclipse activation delayed, see 1.1.b) and par. 6, anomaly report. 5. Science (CT) ========== 5.1 Summary a) Planned observations Last POD file: /isdc/nrt/ops/aux/adp/1176.000/pod_1176_0001.fits Received at : 24 May 13:45 i EXP_ID OBS_ID SRC_NAME POINT_NUM POINT_LEN 1 11760001 09200220001 LMC/SN 1987A 31 3530 2 11760002 09200220001 LMC/SN 1987A 32 3530 b) Solar activity & miscellaneous Low 5.2 IBAS a) GRB in ISGRI FOV: No b) GRB in SPI-ACS: 2012-05-30 02:53:41: Confirmed GRB120530A, also detected by Fermi/GBM and Swift/BAT. c) Other IBAS alerts: No 5.3 TOOs None 6. Anomalies report: ==================== Quote MOC, Anomaly reports: --------------------------- On 2012-05-30 (DOY 151) at 22:34Z during the post-eclipse reconfiguration of JEM-X2, another DFEE anomaly occurred. Following the execution of LECLXT01 ED, the symptoms were as follows: the JEM-X2 DFEE state (TM parameter L5022) remained MEMORY, instead of SAFE, the Active Shutdown Level (TM parameter L5381) remained ECLIPSE instead of RAD. BELTS, the DFEE CPU speed (TM parameter L5583) remained at 8 MHz WAIT instead of 16MHz. The recovery was initiated immediately, and completed before the next scheduled activity (LEACAL01). A DFEE power cycle was performed according to CRP_JEM2_5011, consisting of: - FCP_JEM2_9010 JEMX2 DFEE SWITCH OFF - FCP_JEM2_0021 JEMX2 DFEE ACTIVATION At 22:55:30 JEMX-2 was restored to the nominal state.