INTEGRALPlanckGaiaPOLARCHEOPSEuclidATHENA
HEAVENSFACTCTALOFTSPICAJEM-EUSOXIPEeXTPTheseus
XRISMMAGBOUNDSMARTNet
ISDCCDCI
INTEGRAL Science Data Centre

ISDC END OF REVOLUTION REPORT (NRT)
REVOLUTION 1062 — Report of June 28, 2011


 
 Perigee Passage at start : 2011-06-24T21:40:21
 Perigee Passage at end   : 2011-06-27T21:27:01 
 Radiation Belt exit      : 50066 km (ijd 4193.0411)
 Radiation Belt entrance  : 26708 km (ijd 4195.8380)
 
 Operations Coordinator   : Carlo Ferrigno, Enrico Bozzo
 Pipeline Operator        : Ph.M.
 Scientist on Duty        : Marc Tuerler
 
 S/W version		  : nrt_sw-17.29_2010-05-29T11:35
 -----------

 1. Planning summary
 ===================

 1.1 General remarks
 ------------------- 
 a) JEM-X 1 and 2 on. Eclipse season starts on 06-27.
             
 b) 2011-06-27T14:27: PICsIT PDM04 latch-up (OEM). 
    2011-06-27T14:43: PICsIT in stand-by mode for recovery.
    ISGRI data not affected.   
 
 1.2 Pointings summary
 -------------------- 
   Remarks: Only Science Windows (ScWs) of type 'pointing' are considered.
 - Exposures info from POD version 3. Pointings info from TSF version 8. 
 - Durations given in the executed/planned format; data gaps and bad time
   intervals not excluded from total durations.
 - Deviations: only unexpected deviations >30 secs for pointings assigned to
   an exposure are reported; expected deviations (first & last pointings of
   an exposure longer than planned) not reported. 
  • Exposure 10620001: 'Dummy pointing', staring (1x900s) 1 pointing: 10620002, 1074s/900s (+2m53s)
  • Exposure 10620002: 'Her X-1', 5x5 (34x3000s) 34 pointings: 10620006 -> 10620039, 103629s/102000s (+27m08s)
  • Exposure 10620003: 'Her X-1', 5x5 (37x3000s) 37 pointings: 10620040 -> 10620076, 112827s/111000s (+30m27s)
  • Pointings with no assigned Exposure 6 pointings: 10620001, 0003, 0004, 0005, 0077, 0078, 15765s/3281s (+3h28m03s)
2. NRT Data processing ====================== 2.1 Telemetry ------------ * Start reception: 2011-06-24T20:48:13 End reception: 2011-06-27T20:10:45 * TM gaps of more than 30 seconds: 2011-06-25T05:37:08 2011-06-25T14:01:39 - 2011-06-25T14:02:11 2011-06-25T14:51:54 - 2011-06-25T16:52:34 * Frames missed: 2011-06-25T05:37:08 272 frames missed (3162725667 to 3162725938) 2011-06-25T05:37:08 315 frames missed (3162725973 to 3162726287) 2011-06-25T14:01:40 158 frames missed (3163210038 to 3163210195) 2011-06-25T14:02:11 576 frames missed (3163210273 to 3163210848) 2011-06-25T14:02:11 268 frames missed (3163210880 to 3163211147) 2011-06-25T14:51:54 158 frames missed (3163258268 to 3163258425) 2011-06-25T14:52:26 484 frames missed (3163258503 to 3163258986) 2011-06-25T14:52:58 821 frames missed (3163259064 to 3163259884) 2011-06-25T16:52:34 752 frames missed (3163373950 to 3163374701) * ERT not in sync with UTC: - * Statistics: Mean Rate: 15.98 frames/sec (mean) Frames: 3991870 total Packets: 5616622 total : 0 missed : 6134 missed : 2799306 TM : 5598612 TM : 1192564 idle : 0 tcmd : 0 invalid : 18010 time : 0 idle : 0 invalid * Errors: NCTRSFRAME: invalid quality = 256 (should be 0 or 1): 2011-06-26T07:48:37 - 2011-06-26T07:48:39 2011-06-26T19:04:07 - 2011-06-26T19:04:10 2011-06-27T04:19:34 - 2011-06-27T04:19:50 2011-06-27T15:41:58 - 2011-06-27T15:41:59 2011-06-27T20:11:47 End of File on RTTM socket (connection reset by MOC?) 2.2 Auxiliary files summary -------------------------- POD OPP TSF PAF OLF ASF AHF THF ORB REVNO ----------------------------------------------------------- 2 2 2 2 71 80 1 73 1 1 2.3 Pre-processing ----------------- * Frequent errors for days 2011-06-25, 2011-06-26,2011-06-27, respectively: 23 23 19 "Histogram rejected" 0 0 0 "OBT found too much higher" 2 0 2 "packet(s) of the Histogram are discarded" 0 0 2 "Can not store the Histogram" * Other errors: (per day, not per revolution) 0 10 0 2.4 OPUS Pipelines processing ---------------------------- * REV: completed | errors * INPUT/SCW: completed | errors ------------------------------- ---------------------------- IREM : 69 | 0 161 | 0 ISGRI_cal : 24 | 0 ISGRI_noise: 137 | 0 IBIS_veto : 22 | 0 * QLA completed | errors PICsIT_cal : 54 | 0 ----------------------------- JMX : 268 | 0 IBIS : 79 | 0 ilt : 1 | 0 JEMX-1 : " | 0 Archiving : 1 | 0 JEMX-2 : " | 0 2.5 ISGRI context table ---------------------- 2011-06-27T01:22: IIMG_SDCMOC_D20110625015440_00001.INT sent to MOC 2011-06-27T10:35: IIMG_SDCMOC_D20110625015440_00002.INT provided by Saclay and manually sent to MOC 3. Alerts ========= 3.1 All alerts except OOLs and missing scientific data ------------------------------------------------------ * Level 1: 605 IBIS: The mode differ for 404 sec. from the planning ScW: 106200710010 - 106200730010 from 2011-06-27T14:43:09 to 14:49:53 expected mode: 41 actual mode: 22 from 2011-06-27T14:49:53 to 14:52:04 expected mode: 41 actual mode: 22 from 2011-06-27T14:52:04 to 15:20:37 expected mode: 41 actual mode: 22 -> see 1.1.b) 3.2 Parameter out of limits --------------------------- IBIS: ----- PICsIT latch up in Science Window 106200720010: P0E_MM4ASICLINE P0E_MM4BIASLINE P0S_MM4VTC P0E_MM4TEMP1 P0E_MM4TEMP2 P0E_MM4TEMP3 P0E_MM4TEMP4 P0S_MM4LTC1 P0S_MM4LTC2 P0S_MM4RTC1 P0S_MM4RTC2 P0E_MPDM4STB from 2011-06-27T14:28:34 (UTC) to 2011-06-27T14:42:58 (UTC) -> see 1.1.b) JEM-X2: ------ BUFFER__LOSS ScW: - 106200470010 -> hot spot 3.3 Missing scientific data --------------------------- IBIS: ----- ScW: 106200710010 - 106200730010 These data structures are missing: PICS-SIMH-RAW (or ALL) for mode Observation standard (41) PICS-SISH-RAW (or ALL) for mode Observation standard (41) -> see 1.1.b) 4. Instruments checks (IOSM) ===================== PICsIT class 1 OEM: 2011-06-27T14:27:48: Latch-up module notification. MDU4; status 0. 2011-06-27T14:49:06: ,, ,, -> see 1.1.b) 5. Science (MT) ========== 5.1 Summary ----------- a) Planned observations Last POD file: /isdc/nrt/ops_1/aux/adp/1062.000/pod_1062_0003.fits Received at : 21 Jun 15:55 i EXP_ID OBS_ID SRC_NAME POINT_NUM POINT_LEN 1 10620001 88800080001 Dummy pointing 1 900 2 10620002 08200330001 Her X-1 34 3000 3 10620003 08200330001 Her X-1 37 3000 b) Solar activity & miscellaneous Low to medium 5.2 IBAS --------- a) GRB in ISGRI FOV: None b) GRB in SPI-ACS: 2011-06-25 21:08:21: GRB 110625A sigma=9.5119 duration=60s Also detected by Swift/BAT (Page et al. 2011, GCN 12088), Fermi/GBM and Fermi/LAT (Gruber et al. 2011, GCN 12100). Multipeak structure with bright peaks at T0+1s, T0+4s, T0+8s, T0+21s (the brightest peak), T0+24, and T0+25s. c) Other IBAS alerts: None 5.3 TOOs -------- None 6. Anomalies report: ==================== 2011-06-27T14:27: PICsIT Latch up